and site specific conditions which may have an impact upon the work. <br />Data relevant to the overall project are contained in reports in the <br />• possession of the Owner, which are available for Contractor review. <br />The site description and conditions are presented ~dn the document <br />"112 Permit Application Amendment, San Luis Project" by Steffen <br />Robertson and Kirsten (U.S.), Inc. (SRK), August 19A9. <br />Drawings to be read in conjunction with these Technical <br />Specifications are titled "San Luis Project Tailings Disposal Area," <br />and are in series number 14705/100 and onwards. <br />At any point during the course of the project, ~,t shall be the <br />responsibility of the Contractor to receive written confirmation from <br />the Engineer on work items in question. Should any contradiction <br />either implied or real exist between the Technical :Specifications <br />and the Drawings, the Specifications shall take precedence. In all <br />events, the decision of the Engineer is final. <br />The Owner reserves the right to furnish and! install all <br />• ~ portions of the work described with his own forces if he so desires. <br />Work not covered by these Specifications includes permanent millsite <br />access roads, pumping systems for tailings delivery and water return, <br />and electrical utility lines and poles to the disposal area <br />facilities. <br />Preparation of the disposal area surfaces for placement and <br />installation of synthetic liner may be assigned to a Contractor other <br />than that required to perform the remaining work detailed in this <br />Specification. <br />1.2 Inspection of Work <br />Unless otherwise specified, full-time inspection of all <br />construction activities defined by the Specification will be provided <br />by the Owner. The Owner's inspection of all work shall be performed <br />under the supervision and control of the Engineer or his designated <br />• 2 <br />