Laserfiche WebLink
1.0 GENERAL DESCRIPTION <br />• 1.1 Scooe of Work <br />The scope of work for these Specifications shall include <br />construction of the tailings embankment, the splitter embankment, <br />tailings disposal area liner and drain system, tailings delivery <br />pipeline system, collection system, water return system, storm water <br />diversion system, access roads, and other pertinent structures for <br />the San Luis Project, as shown on the Drawings. Specific features <br />of the work include, but are not limited to the folle~wing: <br /> • Mobilization of all construction equipment. and material <br /> required for the work; <br /> • Construction of temporary and permanent access roads; <br /> • Installation of temporary and permanent surface water <br /> control; <br /> • Clearing, grubbing, and stripping in required areas; <br />• ~ Regrading of the disposal area surface; <br /> Excavation in required areas, including dewatering as <br /> needed; <br /> • Construction of storm water intercept ditches; <br /> • Development of borrow areas; <br /> • Foundation preparation for liner and fill placement; <br /> • Placement of drain pipe liner bedding and synthetic <br /> materials; <br /> • Fill placement and grading; <br /> • Tailings delivery line and distribution systems; <br /> • Collection pond system including the pond berm, spillway, <br /> liners, leak detection/secondary recovery system, and <br /> water return lines to the millsite; <br /> • Furnishing and installing all material and constructing <br /> all items appurtenant and incidental to the above; and <br /> • Demobilization of all construction equipment, removal <br /> of temporary structures, and grading final surfaces. <br />. The Contractor shall familiarize himself with relevant regional <br />1 <br />