My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
placement in the forms shall be four inches plus or minus one <br />• inch. <br />9.2.3 Materials <br />Materials furnished by the Contractor for use in concrete <br />construction shall conform to the requirements of the following <br />sections. All materials actually used are subject to the <br />approval of the Engineer. <br />9.2.3.1 Aaareaate <br />All aggregate shall be stone aggregate conforming to ASTM <br />C-33. <br />9.2.3.2 Cement <br />Cement, except as otherwise specified herein, shall be <br />• ` a brand of Portland cement, approved by the Engineer, <br />conforming to ASTM C-150 or C-175 and shall be Type 1 or <br />Type II. Only one brand of cement shall be used throughout the <br />duration of the work. <br />9.2.3.3 Water <br />Water used for mixing concrete shall conform to the <br />requirements of ACI 301. If the Contractor proposes to use <br />nonpotable water, compressive strengths of .concrete test <br />specimens made from such water shall be laboratory certified <br />prior to actual use of said nonpotable water sources. <br />9.2.4 Batchina <br />Delivery of materials from the hatching equipment to the <br />mixer shall be accurately controlled to produce concrete of <br />• <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.