My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
80-mil HDPE <br />• Thickness (nominal) mils 80 mil ASTM D1593 <br />Thickness, mils, minimum 72 mil ASTM D1593 <br />Density (g/cc), max 0.94 ASTM D1505 <br />Carbon black content, % 2-3 ASTM D1603 <br />Puncture resistance, lb 350 FTMS 1O1C2065 <br />Tear strength, lb 40 ASTM D1004 <br />Ultimate tensile strength, lb/in 240 ASTM D638 <br />Ultimate elongation, X 500 ASTM D638 <br />Modulus of elasticity, psi 80,000 ASTM D882 <br />All values, except when specified as minimur~ or maximum, <br />represent average lot property values. <br />In the event of unspecified criteria for material properties, <br />installation or testing the specification shall adopt the <br />criteria of National Sanitation Foundation Publication No. 54. <br />On-site storage is the responsibility of the Contractor. <br />The rolls shall be stored on a smooth prepared surface (no <br />wooden pallets) and shall not be stacked more than two rolls <br />• , high. The geomembrane shall be stored in such a manner as to <br />be protected from puncture, dirt, grease, water, moisture, mud, <br />mechanical abrasions, excessive heat, or other damage. <br />7.3.2 Placement <br />The liner shall be installed by crews experienced in the <br />placement of the particular type of liner to be installed on <br />projects of similar size and type, according to the <br />manufacturer's recommendations. Experience records of the liner <br />manufacturer and installer shall be submitted too the Engineer <br />for review. Approval of the manufacturer and installer shall <br />be obtained from the Engineer prior to purchase of material <br />or mobilization of the installer. <br />The Contractor shall visually inspect all delivered liner <br />materials on arrival at the job site for damage and <br />• identification. Any damage to the liner panels caused by <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.