My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any stones of such dimensions that would interfere with <br />• compaction in the layer thicknesses specified or impact performance, <br />as determined by the Engineer, shall be removed from the zone in <br />which they are placed prior to compaction. <br />The Contractor shall maintain and protect fills in a condition <br />satisfactory to the Engineer at all times until the finial completion <br />and acceptance of the work. Any approved fill material which becomes <br />unsuitable for any reason whatsoever, after being placed in the fill <br />and before final acceptance of the work, shall be removed and <br />replaced in a manner satisfactory to the Engineer at the Contractor's <br />expense. <br />6.6 Compaction Equipment <br />6.6.1 General <br />The Contractor shall provide sufficient compaction <br />• ~ equipment of the types and sizes specified herein as is <br />necessary for the various fill materials specified herein. The <br />Contractor will be permitted to use alternative equipment, <br />provided the Contractor can demonstrate to the Engineer that <br />such equipment will adequately compact the fill material to <br />a density not less than that which would be produced by the <br />equipment specified; and that no undesirable features, such <br />as segregation or stratification, will occur with the proposed <br />alternate equipment. If the Contractor wishes to use <br />alternative equipment, he shall submit to the Engineer for <br />approval complete details of the equipment and the methods <br />proposed for its use. The Engineer's approval of the use of <br />alternative equipment will be conditional upon the Contractor's <br />construction of test fills at his own expense. Any approval <br />of alternate equipment will not relieve the Contractor from <br />responsibility of obtaining the specified compaction. <br />n <br />U <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.