My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />Engineer, and compacted by two passes of a 10-ton smooth drum <br />vibratory roller, or equivalent. <br />The material shall be graded within the following items: <br />U.S. Standard Sieve <br />or Screen Opening <br />1 inch <br />3/4 inch <br />No. 4 <br />No. 15 <br />No. 200 <br />Percent Passing <br />By Weight <br />100 <br />90-100 <br />35- 65~ <br />15- 40 <br />2- 10 <br />In addition, the fines (minus No. 200 sieve site) shall be <br />nonelastic. <br />• <br />• <br />6.4 Moisture Control <br />6.4.1 General <br />During compaction operations, the materials being placed <br />and the surface of the fill shall be maintained within the <br />moisture content range required to permit proper compaction <br />to the specified density with the equipment being used. The <br />moisture content of the fill materials prior 'to and during <br />compaction shall be uniform throughout each layer of the <br />material. <br /> <br />If material spread on the fill is drier than specified <br />for compaction, the Contractor shall spray water on each layer <br />of the fill and work the moisture into the fill by harrowing <br />or other approved means until a uniform di:ctribution of <br />moisture at the proper content is obtained. Material spread <br />on the fill that is too wet for proper compaction shall be <br />removed or it may be left on the fill and permitted to dry, <br />assisted by discing and harrowing as necessary, until the <br />moisture content is reduced to an amount suitable for obtaining <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.