My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2 Tailings Disposal Area Fill Material <br />• 6.2.1 Tvoe 1 Material <br />The Contractor shall furnish, transport, and place Type 1 <br />material as set forth in these Specifications, or as specified <br />by the Engineer. <br />Type 1 material will be utilized for the construction <br />of the pervious drainage blanket on the upstream portion of <br />the main starter embankment and for Phase II lifts. Type 1 <br />material shall be placed to the lines and grades specified on <br />the Drawings. Type 1 material shall consist of the inorganic <br />soils (sandy gravels) borrowed from on-site sources as shown <br />on the Drawings. Gradation of this material shall allow a <br />maximum particle size of less than 1-1/2 inches where in direct <br />contact with a synthetic liner and three inches otherwise. The <br />gradation shall be as follows: <br />• , <br />U.S. Standard 7 Finer by <br />Sieve Size Wei hg_ t <br />3/8 inch >66 <br />#4 45-95 <br />#10 25-65 <br />#40 5-30 <br />#200 <10 <br />Type 1 material will be in direct contact with the <br />synthetic liner, where utilized as a pervious drainage blanket <br />underlying the main and splitter embankments. The initial <br />dumping shall be confined to an area outside the limits of the <br />lined area. In no instance shall material be directly dumped <br />on the liner. The dumping of material inside the lined area <br />shall be allowed only when sufficient area has been achieved <br />such that damage to the liner will not occur. The material <br />shall be placed such that the final spreading and leveling <br />• produces a minimum three-ft thickness. To the extent <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.