Laserfiche WebLink
6.0 FILL MATERIALS <br />• 6.1 General <br />The embankment, disposal area drains, collection pond, access <br />roads, and other appurtenant facilities incorporate different types <br />of fill material as specified herein. Fill materials shall be <br />obtained from approved sites and local borrow areas. Road base and <br />drain materials shall be either produced in the vicinity of the site <br />or imported. <br />No embankment or synthetic materials shall be placed until the <br />foundation and subgrade preparations have been completed and approved <br />by the Engineer. Subsequent placement of fill shall be made only in <br />areas approved by the Engineer. Placement of the fill shall be done <br />to the lines and grades shown on the Drawings. <br />Fill shall be placed in near horizontal lifts unless otherwise <br />approved by the Engineer. Fill placement procedures and equipment <br />• 1 <br />shall be organized and suitable for constructing a relatively uniform <br />fill meeting minimum density and/or compactive effort requirements, <br />if required. fill surfaces shall be graded to drain as materials are <br />placed. The Contractor shall dewater or provide drainage for ponded <br />water conditions in fill areas. <br />The procedures for the construction using fill materials shall <br />be discussed with, and approved by, the Engineer prior to placement. <br />In particular, construction procedures shall be such to prevent <br />damage to synthetic liners and contamination or damage to drain <br />pipes. Construction procedures shall incorporate methods for <br />minimizing traffic over initial lifts of fill above these materials. <br />Open pipes shall be temporarily capped, as needed, for protection <br />from runoff flows or nearby earthwork in progress. <br /> Fill shall be of inorganic soil or rock materials. The <br />• suitability of all materials intended for use in fill construction <br />19 <br />