My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-13_REVISION - M2004009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004009
>
2006-06-13_REVISION - M2004009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:36 PM
Creation date
11/21/2007 4:12:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
Revision
Doc Date
6/13/2006
Doc Name
Response to Adequacy Review Comments of 8/25/05
From
Asphalt Specialties Co.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E -Reclamation Plan <br />Reclamation Summary <br />This Reclamation Plan proposes to backfill the northeast portion of Cell 1, and a <br />strip of land approximately 300 ft wide west of Cell 1. A 56-acre clay-lined <br />reservoir will occupy the remainder of Cell 1. Cell 2 will be clay-lined and <br />backfilled around the perimeter of the Cell leaving a 25-acre clay-lined lake in the <br />interior of the cell. Cells 3, 5, and 6 will be backfilled to approximate historic <br />grade. Cell 4 will be clay-lined to prevent groundwater inflow into the cell and left <br />as a depression with 3:1 slopes. <br />Reclamation of the pits will occur concurrently with mining. The recharge <br />trenches for Cells 1 and 2 will be backfilled upon completion of dewatering of <br />their respective cells. <br />The general order of reclamation activities is given in Table 6.4.5-1, Reclamation <br />Sequence Summary. <br />Table 6.4.5-1 -Reclamation Sequence Summary <br />Reclamation Activity .Reclamation Sequence <br />Backfill areas adjacent to Oil and Gas <br />Structures - 150 ft radius <br />Backfill the west 300 ft of existing Pond <br />Backfill the Northeast Corner of Cell 1 <br />Clay line Cell 1 <br />Backfill outer perimeter of Cell 2 <br />Clay line Cell 2 <br />Backfill Cell 3 to approx. historic grade <br />Backfill Cell 5 to approx. historic grade <br />Backfill Cell 6 to approx. historic grade <br />Clay line Cell 4 <br />Final Slope Grading to 3:1 <br />Topsoil Replacement <br />Seeding and Fertilizing <br />2 weeks following excavation adjacent <br />to Oil and Gas wells <br />During Mining of the North 1/3 of Cell <br />During Mining of the South 213 of Cell <br />1 <br />Upon completion of mining and <br />backfilling of Cell 1 <br />During and following Mining of Cell 2 <br />Upon completion of mining and <br />backfilling of Cell 2 <br />Following mining of Cell 6 and Cell 4 <br />Following mining of Cell 5 <br />Following mining of Cell 6, with <br />material from Borrow Cell <br />Following mining of Cell 4 <br />Following mining activity for each cell <br />Following slope grading <br />Following Topsoil Replacement <br />Turnpike Mining Resource M-2004-AM-1 <br />Regular 112 application <br />
The URL can be used to link to this page
Your browser does not support the video tag.