r <br />71 Haulroad C rock check dam A portion of the berm material <br />supposedly pushed in was actually a portion of the roadway edge <br />that had been left in place for sump access, and the material that <br />was pushed in consisted of a small section of the berm which was on <br />top of this small bench. Observation of the area indicated no <br />offsite impact or sediment contribution to the stream. <br />8) Ditch G-4 This ditch exhibited a small breech, and was partially <br />blocked by a repair effect. The breech was the result of a snow-dam <br />which impeded flow during the unusually heavy snowmelt period, and <br />the ditch was identified for maintenance. This item was addressed <br />May 24, and was observed by Mr. Berry on May 25. <br />As previously discussed, this spring was unusually wet, and <br />attempts to work in many areas were hampered through a combination <br />of spring showers, snowmelt, and the frost coming out of the ground <br />over an extended period. <br />TCC retained contractors on an overtime basis and over the weekend <br />to complete the required abatements well in advance of the date set <br />forth in the violation notice. Also, TCC personnel worked <br />additional shifts and overtime in co-ordinating and supervising the <br />abatement effort. <br />All of the above-referenced items were addressed prior to the <br />termination of the violation, and Mr. Berry terminated the <br />violation on May 26, 1993. <br />Should you have any questions or comments, please contact me at <br />your convenience. <br />Sincerely, <br />'Marcus M/i//d/d%1/e~ton <br />Environmental Specialist <br />file:\mam\nov79pai.let <br />