Laserfiche WebLink
~- <br />Mr. Lobsrt M. Jonas <br />March 19, 1981 <br />Page Tw <br />be reduced to a 3:1 slops and seeded or pleated. If this is not leaeibla, <br />the staff could pralar bench tops ba located on li:oaatona chars possible, <br />as this is apparently the swra resiataat material available. <br />4. The .25:1 slops imdicatad on the final quarry floor appears to ba in <br />error. Plaaaa classify ehie coacara. <br />S. Please give a data:ilad diagraa o! the reconstructed drainage-ray or dray <br />oa the quarry face,. Sising of raconatructad drainages should approsimata <br />the dimension and shape of misting drainages or dyers. Dtilisatioa of <br />durable rock as rip-rap or arsbr !or the racoaseructad drainages should <br />be considered. Reconstruction of drainage-rays IJould only ba required <br />rhsra it L necusury eo carry ester iron upland drainages. benches <br />should ba eloped to alloy ester to dLchsrga into reconstructed drainages <br />and in a mnnar which could prevent the dischasga of rater directly off <br />the quarry face. /additionally, the approzimata else of say psoposad <br />diversion ditchu should ba described. The method o! conatructioa, <br />stabilisation ar-d a~intanenna of such diversions should also ba addsassad. <br />b. Plaaaa address why shrubs and trau (e.g., ~unipar and pinon pine) wra <br />sot included in the ravagatatioa plea. <br />7. Please describe the wcesaary pond capacity sad operation sad maintenance <br />raqulranaata os proeadures for the proposed settling pond. Eor rill the <br />pond ba racLiaad during final reclasation4 <br />The Mined Land Reclamation Board rill coasidar thin application at the <br />March 25-26, 1981 Board mating. Plena submit proof of conformance rich <br />local soning regulations prior to that lima. <br />i! you have any questions, or nand additional aeaietaaca, please contact a. <br />Siacarely, <br />Brad Janes <br />Reclamation Specialist <br />BJ/gym <br />