Laserfiche WebLink
REGULAR (112) OPERATION CONVERSION APPLICATION <br />JESSE LEE PIT <br />CHAFFEE COUNTY, COLORADO <br />APPLICANT: PELINO, INC. <br />EXIIIBIT L <br />RECLAMATION COSTS <br />Estimate of Reclamation Costs <br />Page 2 of 2 <br />Phase IV 8.5 acres <br />Topsoil <br />Materials None, stockpile on site <br />Labor $35JHr x 120 Hrs $4200 <br />Equipment $40/Hr x 120 Hrs $4800 <br />Seeding <br />Materials $1.50/lb x 75 lbs $113 <br />Labor $20/ac x 8.5 ac $170 <br />Equipment included in labor <br />Mulching & Crimping <br />Materials 530 bales straw x $3.50/bale $1855 <br />Labor $20/ac x 8.5 ac $170 <br />Equipment $40/Hr x 17 Hrs. $680 <br />TOTAL PHASE IH $11,987 <br />Total Reclamation costs, All areas $21,166 <br />