My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-11_REVISION - M1984043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984043
>
2006-09-11_REVISION - M1984043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:08 PM
Creation date
11/21/2007 3:48:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Revision
Doc Date
9/11/2006
Doc Name
112c application
From
Pelino Inc
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULAR (112) OPERATION CONVERSION APPLICATION <br />.IESSE LEE PIT RECEIVED <br />CHAFFEE COUNTY, COLORADO <br />APPLICANT: PELINO, INC. AUG 2 9 2006 <br />EXHIBIT L Division of Reclamation, <br />Mining and Safety <br />RECLAMATION COSTS <br />Estimate of Reclamation Costs <br />Page 1 of 2 <br />Phase I 3.5 acres <br />Materials None, topsoil & vegetation in place, stockpile on site if required. <br />Labor $35/Hr x 40 Hrs $1400 <br />Equipment $40/Hr x 40 Hrs $1600 <br />TOTAL PHASE I $3000 <br />Phase II 1.3 acres <br />Topsoil <br />Materials -None, stockpile on site <br />Labor $35/Hr x 26 Hrs $910 <br />Equipment $40/Hr x 26 Hrs $1040 <br />Seeding <br />Materials $1.50/lb x 32.5 lbs $50 <br />Labor $20/ac x 1.3 ac $26 <br />Equipment included in labor <br />Mulching & Crimping <br />Materials 81 bales straw x $3.50/bale $284 <br />Labor $20/ac x 1.3 ac $26 <br />Equipment $40/Hr x 2 Hrs. $80 <br />TOTAL PHASE II $2416 <br />Phase III 3.0 acres <br />Topsoil <br />Materials None, stockpile on site <br />Labor $35/Hr x 35 Hrs $1225 <br />Equipment $40/Hr x 35 Hrs $1400 <br />Seeding <br />Materials $1.50/lb x 75 lbs $113 <br />Labor $20/ac x 3.0 ac $60 <br />Equipment included in labor <br />Mulching & Crimping <br />Materials 190 bales straw x $3.50/bale $665 <br />Labor $20/ac x 3.0 ac $60 <br />Equipment $40/Hr x 6 Hrs. $240 <br />TOTAL PH ASE III $3763 <br />
The URL can be used to link to this page
Your browser does not support the video tag.