Laserfiche WebLink
C93-17, A TR/MR will be submitted for the repair of Pond 005 <br />by April 30, 1993. <br />C93-18, all ditches will be constructed/reestablished and an <br />MR submitted changing the fan access road to a light use <br />road by April 30. Culvert C-7 will be included with the MR <br />for the coal stockpile area (NOV C93-16) <br />C93-19 was abated April 29th, 1993. An electric fence was <br />place around the #4 stockpile to prevent grazing. No <br />grazing will be permitted on Basin Resources property in the <br />North Intake area. The property boundary is already fenced. <br />if you have any questions or require additional information, <br />please contact me at (719) 868-2761 Extension 107. <br />Sis~cer 1~ <br />Ronald G. Thompson <br />Senior Mine Engineer <br />