Laserfiche WebLink
Step 10: Submit as-built (as-repaired) construction drawings for the cleaned Sedimentation <br />Pond E, with a demonstration of adeauacv for treatment of surface inflows (process flows and <br />• surface runoff. 02/09/07). <br />TCC submitted a revised pond design showing the was-repaired" configuration, along with <br />appropriate hydrology and sedimentology demonstrations on February 8, 2007. Abated <br />02/08/07. <br />Stea 11: Report, in writing, completion of the Foidel Creek cleanup to the Division, CDPHE- <br />WOCD, CDOW, and USACE (02/09/071. <br />The previously submitted Abatement Report was updated to reflect completion of all required <br />abatement and clean-up activities, with copies submitted to the CDRMS, CDPHE-WQCD, <br />CDOW, and USACE on February 8, 2007. Abated 02/09/07. <br />• <br />• <br />IVOV CV-2006-006 Abatement Report 8 2/7/2007 <br />