My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37735
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:39 PM
Creation date
11/21/2007 3:43:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
2/8/2007
Doc Name
Abatement Completion Report for Abatement 10 and 11
Violation No.
CV2006006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br />~e following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />Iolation, previous violations still requiring abatement and the termination of violations cited during previous inspections. <br />Notice of Violation number NOV CV-2006-006 was issued from the Division office on September 18, 2006. <br />Required abatements and dates of abatement are: <br />Step 1: By 13 September 2006, cease dischazge of thickener underllow to Sedimentation Pond E. <br />Step 2: By 13 September 2006, repair the thickener underflow pipe. <br />Step 3: By 13 September 2006, perform immediate damage control activities on Foidel Creek. <br />Step 4: By 13 September 2006, notify CDPHE, CDOW and the CE of this event. <br />Step 5: By 29 September 2006, notify downstream water users (demonstrate to the Division). <br />Step 6: By 29 September 2006, assess the dischazge and receiving stream water quality and toxicity impacts. <br />Step 7: By 29 September 2006, submit coordinated plans for abatement. <br />Step 8: By 30 October 2006, comply with CDPHE dischazge permit and direction, WQCC standards. <br />Step 9: By 30 October 2006, re-establish all DRMS-approved sediment control systems. <br />Step 10: By 11 December 2006, submit as-built (as-repaired) Pond E drawings. <br />Step 11: By 11 December 2006, report, in writing, completion of Foidel Creek cleanup <br />The dates of abatement for the following violation steps of CV-2006-006 are: <br />~ep 1: 13 September 2006, by site inspection <br />Step 2: 13 September 2006, by site inspection. <br />Step 3: 13 September 2006, by site inspection. <br />Step 4: 13 September 2006, by copies of communications at the Denver office. <br />A previous notice of violation, CV-2006-004, had been terminated on 5 September 2006. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> <br />C-1982-056. CP Inspection of September 13, 2006 Page 8 of 8 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.