Laserfiche WebLink
Step 3: Identify and isolate the source(s) of the contamination; <br />Step 4: Address the source and determine additional mitigation required including: <br />a. Installation of domestic cistern(s); <br />b) Active collection of the contaminant including pumping wells or other means. <br />The nature of the water quality parameter exceedance will necessarily dictate the employed mitigation <br />response. <br />4.5 Health and SafefV <br />All work described herein will be conducted consistent with applicable Occupational Safety and Health <br />Administration (OSHA) requirements. As deemed necessary, personnel involved in the work will be current <br />with respect to the required OSHA training and refresher courses, in accordance with the requirements of <br />Title 29 Code of Federal Regulations, Part 1920.120. Field work will be performed in Level D personal <br />protection. <br />5.0 CONCLUSIONS <br />The proposed groundwater quality monitoring program will provide a good basis for evaluating impacts from <br />the proposed mining, if they should occur. <br />Z:IprojecLS\SW Investment Group -12315W TKO Joint Venture\DMG PERMIT1GWMonil-program.doc <br />Groundwater Sampling and Analysis Plan October 2005 <br />Lupton Lakes Project -5- <br />