My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 11 Page 2 003-2203 <br />. Ames performed excavation remediation activities at underground workings UG-278, UG-279, UG- <br />304, UG-~14, UG-515, and UG-292a. Workings were designated as "Shallow" or "Deep" as <br />defined in the drawings, and were remediated accordingly. <br />Ames constructed a geogrid cap over UG-274. Ames placed two layers of geogrid in accordance <br />with the drawings and specifications. <br />Ames placed Structural Fil] (SF) over previously remediated working UG-269. <br />Field Monitorine and Testing_Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed and documented excavation remediation activities associated with the Phase IV <br />underground working construction. Workings were designated as "Shallow" or "Deep" as defined in <br />the drawings and were remediated accordingly. <br />. Golder observed placement of SF and geogrid for underground working remediation. These materials <br />were placed in accordance with the drawings and specifications into excavated or open underground <br />workings. Golder previously obtained samples of SF for laboratory testing. Materials supplied met <br />specifications. <br />Laboratory Tests <br />Golder did not obtain any samples or perform any laboratory testing during this reporting period. <br />Meetines <br />CC&V held a Weekly Contractors meeting on February 25, 2003 and on March 4, 2003. Items <br />discussed included Safety, Environmental, Schedule, and CQA. Golder was informed by CC&V at <br />the March 4 meeting that personnel would not be required on-site until the end of March, due to no <br />construction. The next weekly meeting will be held on Mazch 18, 2003 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br /> <br />Phan IW I I Fe610-MarB, 2003 Golder Associates Inc. <br />