My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i =-_ <br />-- ~- Golder <br />1~.SSOC121teS <br />June 3, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303}980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />I3E: Summary No. 19: May 25 through May 31, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of May 25 <br />through May 31, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 39° F to 49° F, and highs ranged from 66° F to 80° F. Precipitation was <br />recorded on May 25 through May 31. Weather observations were made on six days of this seven- <br />day reporting period. <br />Construction Synopsis <br />Ames Constmction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb <br />construction. Ames conducted Phase Nb and c construction activities on six days of this seven-day <br />reporting period (May 26 through May 31, 2003). Poly-Flex conducted Phase Nb construction <br />activities on six days of this seven-day reporting period (May 26 through May 31, 2003). <br />Phase IVb <br />Ames began excavation of the Phase IVb /Phase Nc geomembrane anchor trench, excavating <br />approximately 200 feet of northern anchor trench, west of the Loadout bin (LOB) azea. Ames also <br />excavated approximately 150 feet of temporary anchor trench azound the LOB turnout. <br />Ames completed backfill of upper Phase IVb PSSA primary anchor trench, backfilling approximately <br />• 200 feet of north primary anchor trench, and approximately 200 feet of south ore slope primary anchor <br />trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.