My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
== <br />-- _~ =Golder <br />1~S.SOClc'lfeS <br />May 27, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 18: May 18 through May 24, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of May 18 <br />through May 24, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 28° F to 44° F, and highs ranged from 47° F to 77° F. Precipitation was <br />recorded on May 18 through May 20, and May 24. Weather observations were made on six days of <br />this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb and <br />c construction. Ames conducted Phase Nb and c construction activities on five days of this seven-day <br />reporting period (May 19 through May 23, 2003). Poly-Flex conducted Phase Nb construction <br />activities on six days of this seven-day reporting period (May 19 through May 24, 2003). <br />Phase IVb <br />Ames continued excavation of the upper Phase Nb PSSA geomembrane primary anchor trench, <br />excavating approximately 450 feet of northern primary anchor trench, and approximately 350 feet of <br />south ore slope primary anchor trench. <br />Ames continued backfill of upper Phase Nb PSSA primary anchor trench, backfilling approximately <br />. 200 feet of north primary anchor trench, and approximately 100 feet of south ore slope primary anchor <br />trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.