Laserfiche WebLink
_- = GOItI~T <br />-Associates <br />May 20, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />13E: Summary No. 17: May 11 through May 17, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of May 11 <br />through May 17, 2003. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 24° F to 41° F, and highs ranged from 58° F to 75° F. Rain was recorded <br />on May 15. Weather observations were made on six days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb and <br />c construction. Ames conducted Phase Nb and c construction activities on six days of this seven-day <br />reporting period (May 12 through May 17, 2003). Poly-Flex conducted Phase IVb construction <br />activities on six days of this seven-day reporting period (May 12 through May 17, 2003). <br />Phase Nb <br />Ames continued excavation of the upper Phase Nb PSSA geomembrane primary anchor trench and the <br />lower secondary anchor trench, excavating approximately 200 feet of northern primary anchor trench, <br />and approximately 150 feet of south ore slope secondary anchor trench. <br />Ames hauled, placed, and compacted Structural Fill (SF) ore material to construct the east end berm of <br />. the Phase IVb PSSA. The inboard slope of the berm was graded and surveyed prior to placement of <br />Bedding Fill. <br />