Laserfiche WebLink
Phase (Vb Weekly Summary No. l6 Page 4 003-2203 <br />• Golder monitored and observed the removal of DCF in the Phase IVb /Phase III tie-in, and the <br />Phase I / IVa /IVb tie-in azea. Golder CQA monitors verified width of lap required and mazked the <br />existing liner damage for future tie-in activities and repairs. <br />Laboratory Tesis <br />Golder obtained no QA samples of earthwork materials during this reporting period. <br />Meetines <br />CC&V held a Weekly Contractors meeting on May 6. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on May 13, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />• Ron DiDonato <br />Resident CQA Monitor <br />rn.:e~w tetiayamayio, zoo; Golder Associates inc. <br />