My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase [Vb Weekly Summary No. l4 Page 3 003-?203 <br />Golder observed and documented remediation activities associated with the Phase IV underground <br />working construction. <br />Golder observed anchor trench excavation in the Phase IVb PSSA for proper location and dimension <br />(2' wide by 3' deep). Anchor trench excavation met or exceeded the requirements of the <br />specifications. Golder observed anchor trench backfill in the Phase IVb PSSA for lift thickness and <br />proper method of compaction. <br />Golder observed construction of the Primary Underdrain in Phase IVb for trench dimension (5' wide <br />by 3' deep), slope (minimum 1%), materials, and geotextile overlap. <br />Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase IVb azea met the project specifications. <br />Golder visually observed the placement of LVSCP in the Phase IVb PSSA area. Golder CQA <br />monitors (one monitor per dozer when dozers are greater than 50 ft apart) observed LVSCF <br />placement. <br />Laboratory Tests <br />Golder did not obtain any QA samples; however, laboratory testing of QC samples was conducted to <br />• corm suitability of materials used during this reporting period. <br />Meetines <br />CC&V held a Weekly Contractors meeting on April 22. Items discussed included Safety, <br />Envirottmental, Schedule, and CQA. The next weekly meeting will be held on April 29, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Ron DiDonato <br />Resident CQA Monitor <br /> <br />Phase iVb l6 AOQO-Ap26.?003 Golder Associates lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.