Phase IVb Weekly Summary No. 14 Page 2 003-2203 <br />. Ames continued placement of Structural Fill (SF) in the Phase IVb area, placing SF on the Substation <br />Hifl south and west slopes. Ames also continued slope recontouring and re-compaction on Substation <br />Hill and Raven Hill. <br />Ames completed drilling of perforation holes into the 26-inch High Volume Solution Collection System <br />(HVSCS) piping. Ames welded the 14-inch HDPE piping for the Low Volume Solution Collection <br />(LVSCS) riser piping. <br />Ames continued Drain Cover Fill (DCF) removal near the Phase III /Phase Nb PSSA tie-in in <br />prepazation for east end berm and Phase IVb constmction. <br />Ames excavated and constructed approximately 500 feet of Primary Underdrain on the west slope of <br />Substation Hill in the Phase IVb azea. <br />Ames placed Low Volume Solution Collection Fill (LVSCF) onto the previously repaired, tested, and <br />documented aeeas ofpanels L-354, L-355, and L-351, where dozer damage occurred in January 2003. <br />Poly-Flex continued deployment of 100-mil smooth (upper) LLDPE geomembrane in the Phase IVb <br />PSSA. Poly-Flex deployed 100-mil smooth LLDPE geomembrane over an area of approximately <br />241,224 squaze Feet in the Phase IVb PSSA during this reporting period. Geomembrane panels U-20 <br />through U-114 were deployed, seamed, and pressure tested by Poly-Flex. Destructive fusion seam <br />samples DFu-07 through DFu-35, were marked and removed. Destructive fusion seam peel and shear <br />. tests of samples DFu-O1 through DFu-16 were performed. One destructive sample (DFu-09) failed <br />strength tests, and additional destructive tests were conducted to delineate the affected area. Caps were <br />extrusion welded over the failed seam length, vacuum tested and documented. <br />Phase IVc <br />Ames resumed limited cut to fill activities within the northern limits of the Phase IVc azea. Ames <br />hauled oversize material from the Phase IVc area to an uncontrolled fill site. <br />Ames constructed a geogrid and Select Structural Fill (SSF) cap over working UG-278. Ames placed <br />two layers of geogrid in accordance with the drawings and specifications. Approximately 4,502 square <br />feet of geogrid was placed over the working. <br />Field Monitorin¢ and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed placement of SLF in Phase IVb for subgrade preparation, thickness, compaction, <br />• moisture content, and earthworks materials used. <br />rmu rvt ia,tor_o-apnb, zrw; Golder Associates lnc. <br />