My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=- <br />- =Golder <br />ASSOClc'iteS <br />Februazy 19, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 10: February 2 through February 15, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of February 2 <br />through February 15, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from -9° F to 31 ° F, and highs ranged from 19° F to 50° F. Snow was recorded <br />on February 3`d 5`n 6`n and 13~'. Weather observations were made on ten days of this fourteen-day <br />reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IV b <br />and c construction. Ames conducted Phase fV b and c construction activities on four days of this <br />fourteen-day reporting period (February 11 through 14). During the week of February 3rd, Ames and <br />Golder personnel arrived each morning prior to the cancellation of each working shift due to adverse <br />weather conditions. <br />Phase IV b <br />Ames did not perform construction related activities within the Phase IV b area during this reporting <br />period. <br />I• <br />
The URL can be used to link to this page
Your browser does not support the video tag.