Laserfiche WebLink
~~ <br />.. <br />Conclusion• <br />From the two site inspections taken on January 28, 1994 and again <br />on February 4, 1994, I believed the operator had in fact, addressed <br />the violation and that surface water drainage off the refuse pile <br />would be contained in the proper manner as outlined in Rule <br />4.05.2(1), 4.09.1(1)(a) and (b), 4.10.1(1)(a). <br />All surface water drainage will now be routed off the surface of <br />the refuse pile and onto the drainage system and ditches, <br />eventually being treated by the upper bench sediment pond before <br />exiting the mine site. <br />