My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-11-28_REVISION - M1980027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980027
>
2005-11-28_REVISION - M1980027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:07 PM
Creation date
11/21/2007 3:34:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980027
IBM Index Class Name
Revision
Doc Date
11/28/2005
Doc Name
Reclamation Cost Summary Form
From
DMG
To
Jerry Carpenter
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 11/25/2005 <br />User : BMK <br />State :Colorado PermiUjob# : M-1980-027 <br />County :Grand Abbreviation :none <br />Site :Bumgardner Filename :M027-001 <br />Agency or organization name :GMG <br />Permit or otherjob action :CONVERSION <br />Task description :CUT SLOPES TO 3:1 <br />::. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat OSR Series II - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shill basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.88 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. costlhour : $4.64 50 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $152.39 Total fleet cosUhour : x152.39 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,471 LCY factor : NA volume : 6,471 LCY <br />Source of estimated volume :EXHIBIT E <br />Source of estimated swell factor : NA <br />Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 % (~ <br />Average site altitude : 7,500 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Earth -Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.557 /LCY <br />Operator skill : 0.75 (avl <br />Material consistency : 1.00 (Cat. <br />Dozing method : 1.20 (slc <br />Visibility : 1.00 (avl <br />Job efficiency : 0.83 (1shiR <br />Spoil pile : 0.80 (fnd <br />Push gradient: 1.05 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 1.1 D (Cat <br />Blade type : 1.00 (S/S! <br />Net correction : 0.68 <br />Adjusted unit production : 273.83 LCY/hr <br />Adjusted fleet production : 273.83 LCY/hr <br />Total job time : 23.63 Hours <br />Total job cost : x3,601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.