My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-11-28_REVISION - M1980027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980027
>
2005-11-28_REVISION - M1980027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:07 PM
Creation date
11/21/2007 3:34:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980027
IBM Index Class Name
Revision
Doc Date
11/28/2005
Doc Name
Reclamation Cost Summary Form
From
DMG
To
Jerry Carpenter
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 11/25/2005 <br />User : BMK <br />State :Colorado PermiUob# : M-1980-027 <br />County :Grand Abbreviation :none <br />Site : Bumgardner Filename : M027-002 <br />Agency or organization name :DMG <br />Permit or other job action :APPLY 5" TOP SOIL OVER 6 ACRES <br />Task description :APPLY 5" OF TOPSOIL <br />;: ,: <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $42.78 NA <br /> Operating cost/hour : $66.09 100 <br /> Ripper op.cosUhour : $0.00 NA <br /> Operator cost/hour : $31.78 NA <br /> Total unit wsUhour : $140.66 Total fleet cost/hour : $140.68 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,840 CCY factor : 1.215 volume: 5,881 LCY <br /> <br />Source of estimated volume :RECLAMATION MAP <br />Source of estimated swell factor :EXHIBIT S <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Ca[ HB) <br />Average site altitude : 7,500 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.90 <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.391 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower : 310 <br />Total job time <br />Total job cost <br />359.40 LCY/hr <br />359.40 LCY/hr <br />16.36 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.