within lifts or lack of proper bonding between lifts shall be deemed a failure and will be <br />' required to be removed and replaced to the satisfaction of the Engineer. <br />Foundation Requirements for Interior Dike <br />' The foundation for the interior dike shall have the following requirements for preparation, <br />' placement and protection: <br />1. The placement of material on the foundation for all exposed bedrock shall be done to the <br />lines and grades as shown on the plans. The Engineer shall be on-site during all placement <br />activities between the bedrock and interior dike embankment. An adequate bond between <br />the bedrock and the fill is required that meets compaction, moisture requirements. <br />' 2. No material shall be placed in any portion of the interior dike embanlanent until the <br />foundation for each section has been dewatered, stripped, scazified and compacted, and has <br />' been approved by the Engineer. <br />3. The foundation may be exposed in sections. The Contractor shall prepare a plan that details <br />' the excavation and embankment placement sequence at the start of the project. The plan will <br />be updated on a weekly basis for the duration of the project and resubmitted to the Engineer <br />_ each week as a requirement for approval of pay requests. <br />4. The amount of time bedrock is exposed shall be limited to one shift, or 12 hours. Between <br />shifts bedrock must be covered by a minimum of two loose lifts. <br />5. The maximum number of fill interfaces allowed in the keyway of the interior dike shall be <br />no more than 3. <br />6. The foundation preparation shall require the Contractor to expose competent bedrock by the <br />removal of all weathered, fractured and unsuitable materials as deemed necessary by the <br />Engineer. The removal may require the use of scrapers, ripping with dozers or other <br />methods as deemed appropriate. This shall also apply to the key trench in the foundation. <br />No embankment material shall be placed in the embankment while either the material, <br />foundation, or embankment on which it would be placed, is frozen. <br />8. Adequate time shall be allowed by the Contractor for surveying in the location of the key <br />trench prior beginning placement of embankment. The location of the key trench at both <br />ends of the interior dike where the slurry wall tie in is planned must be accurately mapped to <br />give construction control for the wall placement. The Contractor is responsible for <br />providing the surveying. <br />Fulton Lake Embankment Specifications and Testing requirements <br />9000 - 2 <br />