' Fulton Lakes Pit <br />Embankment Specifications and Testing Requirements <br />' Embankment Materials and Placement <br />' 1. Materials used in the perimeter embartl~tent adjacent to the slurry wall shall be <br />inorganic soils containing a minimum of 45% materials passing No. 200 Sieve and no <br />cobbles larger than 6 inches placed as directed by the Owner. The materials shall meet <br />the classifications tested by CTL Thompson in their site evaluation of borrow sources. <br />The Engineer may reject any materials deemed unsuitable for use in the dam <br />construction. <br />2. The Interior dike shall consist of zoned materials. The Zone 1 materials for the <br />impermeable core shall consist of good quality clay shale from the bedrock. The clay <br />' shale shall have a minimum of 50% fines passing the No. 200 sieve and shall be <br />reasonably well graded. It shall have a Plasticity Index of 10 percent or greater for the <br />portion of material passing through the No. 40 sieve. The clay shale shall be disked and <br />' worked into a uniform plastic material that is consistent with CL material. The clay <br />shale shall be properly broken down and not blocky. <br />' 3. The Zone 2 materials in the interior dike shall consist of sandy clay overburdens that <br />exist on-site and are consistent with the materials tested and used in the slope stability <br />' analysis performed by CTL Thompson. The material should have a Plasticity Index (PI) <br />above the "A" line of the Soil Classification Chart. <br />4. The placement moisture content of materials shall be from 1% below to 2% above the <br />optimum moisture content as determined by ASTM D 698. <br />' S. Layers of material shall be spread in layers not exceeding 9 inches in thickness (loose) <br />and compacted to at least 95% maximum density (ASTM D 698) A compactor shall be <br />required on each lift with sufficient passes to achieve the specification. <br />' 6. The Contractor is responsible for preparing a sequencing plan for all fill placement for <br />acceptance by the Engineer. No contiguous vertical joints between fill sections are <br />' allowed. The minimum horizontal stagger length between joints is 100 feet. The <br />parameters for allowing joints and staggered fill sections in the embankment are slopes <br />no more than 4:1 for connecting fills and no difference in height of 5 feet between fill <br />' sections aze allowed. All joints between fill sections shall be connected together with <br />clean fresh material. An existing fill section shall be cut down to fresh material, <br />scarified and moistened to allow a tight interface with new fill. <br />7. All lifts shall be placed longitudinally, pazallel to the centerline of the interior dike. No <br />lifts shall be placed at a slope of greater than two percent. Any cross section the <br />difference in elevation between lift placements shall not be greater than 24 inches. <br />8. All lifts shall be scarified to whatever depth is necessary and compacted to achieve <br />proper bonding between lifts. Any vaziations in moisture outside the specifications <br />Fulton Lake Embankment Specifications and Testing requirements <br />9000 - I <br />