Laserfiche WebLink
<br /> 1 from $2500. The reason it's a $2500 is because it was <br /> 2 approved orig inally in March, '80. <br /> 3 MR. BOLDER: You want to raise it to what <br /> q now? <br /> 5 MR. ZALKIND: To 5,000. <br /> 6 CIiAIRMAN TURNER: Okay. P9ark, let's see <br /> ] the slides an d then we will ask any questions after~vards- <br /> g (Whereupon, there was a slide presentation, <br /> 9 during which the following questions and answers were <br /> 10 propounded:) <br /> 11 MR. LOPE: Okay. Now, we're basically <br /> 12 looking at th e main mining area. You can see the highwalls <br /> 13 behind the St ate vehicle and some equipment there, a <br /> <br /> 14 conveyor. <br /> 15 Okay. These are stockpiles of material <br /> 16 in the mining area. Behind, you can see the highwalls that <br /> 17 are somewhere in the neighborhood of 15 feet, perhaps a <br /> 18 little more. And this is an active mining area. Mining <br /> 19 was going on the day I was there, actual excavation. <br /> PO This is more of a main plant area that's <br /> 21 separated by a very small distance from the mining area, <br /> 22 where there a re stockpiles as well as a pond of some sort <br /> 23 which is not clearly defined in the permit application <br /> P4 that we have at this point. <br />• • ' <br /> 25 Okay. It was getting a little dark. I <br />m <br /> f7(ff \ (.i kPl \!fk S iS.gf $'H IV ti. l\( <br /> ('rruhrJ lhorduuul krp~,rr, .. <br /> I SINI ('hrrri nllr kuaJ <br /> !.n (Irrun. Colorado 8!I!7! <br /> <br /> <br />