Laserfiche WebLink
Describe any associated drainage or runoff conveyance structure (culven, etc.). _nclnde <br />sufficient information to evaluate stricture sizing. <br />Specify how much water will be used in conjunction with the operation (dust con,rol <br />etc.), and the source of this water. <br />Describe what measures (if any) will be taken to minimize disturbance to the hydrologic <br />balance, prevent off-site damage, and provide for a stable configuration of the reciair*_med <br />areas. <br />Will the mined clay be processed on site? If so, describe the nature of the process. <br />3. Exhibit E -Reclamation Plan -please describe the type of reclamation the A.p[iiic~nt <br />proposes to achieve and why it was chosen. <br />Provide a comparison of the proposed post-minim land use to other land uses i:; ;he <br />vicinity. <br />Describe how the reclamation plan will be implemented to meet each appticai`,le <br />requirement of Section 3. ]. . <br />Which areas of the prepesed amended lands will be graded and hog;~ will the ~r._~t:::g :~e~ <br />carried out so as to create a final topography appropriate to the final land use (_ . i.5(i))? <br />How does the Applicant plan to compact the backfilled material so it remains stable <br />(3.1.5(2))7 <br />If the topsoil is not replaced in the disturbed areas within one growing season, a <br />vegetative cover or other means shalt be employed so that the topsoil is protected 'o: <br />erosion and is in a usable condition for reclamation (3.1.9(1)). Please describe ;pow i::e <br />topsoil stockpile will be protected from wind or water erosion. <br />What measures will be undertaken to assure the stability of replaced topsoil on gra ed <br />slopes (3.1.9(5))? <br />Please clearly describe where in the permit, or subsequent permit revision, the <br />established seed rates, grass species, fertilizer rates and soil preparation requirements ,: a.: <br />be found. <br />4. Exhibit F -Reclamation Plan Map needs to be signed by the qualified person wl;o <br />prepared the map. <br />Does the map boundary identify and outline the permit boundary or the affected land <br />boundary (or are the boundaries the same)? See paragraph 1 above. <br />As of February 28, 2003, Mr. Wayne Spence said that the public notice had not been pubtisired <br />even though the Division notified Acme Brick on January 10, 2003 to publish notice withi^ ':0 <br />days (or by January 2Q 2003). As a result, pursuant to Rule ].4.1(13), an additional time pe=iod, <br />as determined by the Division, may be added for the Office or Board to make a decision. Such <br />time period shall not exceed ninety (90) days for any 113 Reclamation Permit Application <br />without objections, or 120 days for any 7 12 Reclamation Permit Application with objecro:~s. <br />Please submit a copy of the published notice to the Division as soon as possible so a new <br />decision date can be set (if necessary). <br />Prior to final consideration of the application, the Applicant must submit proof of publicatici '~ <br />and proof of al] other required notices to the Division. <br />The current decision due date is April 9, 2003. If the above noted adequacy items are nct <br />adequately addressed by the current decision date, or the revised date if a new one is sei, il:~ <br />application may be denied. <br />