My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-07_REVISION - M1976020 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976020
>
2002-02-07_REVISION - M1976020 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:30 PM
Creation date
11/21/2007 3:21:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Revision
Doc Date
2/7/2002
Doc Name
Amendment Application
From
Oldcastle SW Group Inc dba Four Corners Materials
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT D <br />Up to the permit amendment in 2002, the permit allowed sand and gravel mining in the River itself. <br />The 2002 amendment was made to allow one-time mining of an adjacent terrace to form a lake next <br />to the river and reclaim three existing abandoned water treatment lagoons in the lake area. There- <br />fore, the mining plan has been divided into two sections -river mining and lake mining. The entire <br />revised permit area is 40.78 acres. The breakdown of this acreage is given below: <br />Area Description Acreage <br />1. Extraction area in river 1.51 <br />2. Non-extraction area in river 7.03 <br />3. Undisturbed riverplain at southeast corner of permit area 0.24 <br />4. Lake extraction area 4.74 <br />5. Yard area, processing, stockpiles, on-site roads, topsoil, sediment sump, riverbank 27.26 <br /> <br />Total 40.78 <br />1. General Plan- River Mining <br />Normal operation has been based on allowing spring thaw flows and summer thundershowers to <br />deposit gravel in the west channel and partially fill in the main dredge hole also located in the west <br />channel of the River (west of the dike) with gravel material. When flows were reduced in the late <br />fall or early spring, the low flow of the river was directed to the east channel and gravel harvesting <br />occurred in the west channel. The dredge hole has been filling in at a greater rate since mining <br />stopped in 1998 but portions of the hole are still approximately 10 feet deeper than the bottom of <br />the channel. At one time, the hole was 50 feet deeper than the channel upstream and downstream. <br />As explained in the Introduction, this hole was the result of old gold dredge which operated on the <br />Thomas Pit 2/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.