Laserfiche WebLink
PRE-MINING AND MINING PLAN MAPS OF AFFECTED LANDS <br />EXHIBIT C <br />Mining has occurred on the site since the early 1900's, as described in the Introduction section. <br />Also, the River has modified its own course during this time. For these reasons, no accurate map <br />can be made of the pre-mining site. Map C-1 shows the site as it existed in 1996 based on aerial <br />photography and mapping at that time. The exact topography of the original site is not known in the <br />yard area and the mining area since mining took place long before the first map was made. Initially, <br />there were no excavations in the River and along its banks. Also, the dike berm in the River itself <br />did not exist. Channel bank locations were probably somewhat different than that which currently <br />exist. <br />Map C-2 accurately reflects all mining which has occurred to the end of 2001 and what is planned <br />for the lake excavation at the south edge of the permit area for the amendment in 2002. <br />Thomas Pit 2/02 <br />