Laserfiche WebLink
: • • <br /> Berhan Keffelew <br /> June 17, 1999 <br /> Page 2 <br /> continue to be used for road watering with application by water trucks, or sprinkler <br /> systems designed to wet road surfaces for dust control. <br /> The pipes will be laid on the ground surface and will not be buried except as deemed <br /> necessary where they cross roads or drainages. Portions of the water lines will be double <br /> walled where they cross Highway 67, and where they cross major drainages above <br /> ground. Water may be transported via gravity flow or pumps. <br /> The pipeline routes are shown on the attached map. The pipeline from Pads 3 and 4 is on <br /> the eastern side of the property and is approximately 5,480 feet in length. The pipeline <br /> from the Victor Pad is on the western side of the property and is approximately 14,190 <br /> feet in length. Both pipelines terminate at the VLF as shown on the map. <br /> Bruce DeWyk prepared the attached reclamation cost estimate for removal of the <br /> pipelines. Mr. DeWyk has prepared the Division-approved reclamation cost estimates for <br /> Amendment 6 and Amendment 7 to Permit No. M-80-244. The total cost for pipeline <br /> reclamation is estimated to be $13,673.00. The reclamation cost estimate assumes <br /> contractor costs to cut the polypropylene pipe into lengths, load the pipe onto a truck, and <br /> dispose of the pipe on-site by burial in an Overburden Storage Area. <br /> On March 22, 1999, the Division granted approval for use of detoxified Pad 3 and 4 <br /> material as requested by CC&V in a letter dated March 15, 1999. Currently, the Division <br /> retains $507,320.00 in financial warranty for detoxification of Pad 4. Since the Pad 4 <br /> material approved for various uses, the financial warranty for detoxification is no longer <br /> required. <br /> As agreed upon during your site inspection of June 10, 1999, an appropriate portion of <br /> the financial warranty for detoxification of Pad 4 will be allocated to provide financial <br /> warranty for reclamation of the pipelines from Pads 3 and 4 and the Victor Pad to the <br /> VLF. Specifically, that portion is $13,673.00, based on the attached reclamation cost <br /> estimate. <br /> Please do not hesitate to contact me at 719-689-4056, should you have questions or <br /> comments. <br /> Sincere] <br /> Phil Barnes <br /> Chief Environmental Coordinator <br /> cc: Mr. Jim Watson, City of Victor <br /> Ms. Jane Mannon, Teller County Planning Department <br /> Enclosures: 3 (a/s) <br />