Laserfiche WebLink
Mr. Randall Price <br />Colorado Mined Land Reclamation Division <br />January 13, 1995 <br />Page 2 <br />Notice of Violation Abatement Actions <br /> Necessary Steps to Abate the <br />Nature of Violation Violation Description of Action <br />Failure to maintain (1) Remove plastic/rubber The plastic/rubber sheeting from inside the primary <br />Impoundment No. I, sheeting from inside the spillway has been removed and disposed of in a <br />so as to ensure primary spillway proper manner (14 October 1994). <br />proper function of <br />the primary outlet. (2) Remove overgrown The overgrown vegetation was removed (l4 <br /> vegetation from cutlet end of October 1994) fmm the outlet end of the primary <br /> primary spillway. spillway. <br />Failure to maintain Repair erosion damage and A contract has been arranged (l November 1994) <br />Impoundment No. 1, reestablish required with Spalding Construction Company to uncover <br />so as to provide embankment gradient; and backfill (compacted) muskrat burrows and to <br />adequate vegetation establish vegetation or other tamp in gopher burrows, reconstitute the upstream <br />or other surface stabilization. face of the dam to a 3 horizontal to 1 vettical <br />stabilization of gradient (minimum), and to place riprap (3-inch to <br />embankment against 6-inch, 9 inches deep) over geotextile (Mirafi 700X <br />erosion. Fabric) on [he face of the slope. The riprap will <br /> extend from an elevation 1/ foot above the crest of <br /> the primary spillway (a slope distance of a little <br /> over a foot) to allow for wave run-up, to <br /> approximately 10 feet down the slope (region of <br /> current deposition). Arrangements have been <br /> made to purchase the riprap Mirafi. Inclement <br /> weather has delayed the work. The work will be <br /> scheduled as soon as ground conditions permit <br /> earthwork and access to the site by construction <br /> equipment without undue disturbance to reclaimed <br /> areas (historically, late fall). Until construction is <br /> complete, seepage, especially in the vicinity of the <br /> muskrat burrows, will be an item of special <br /> interest of quatterly inspections. If seepage <br /> develops, the pond will be drained and kept <br /> dewatered by raliuval of the primary spillway <br /> baffles until repairs are complete. <br />Failure to maintain Replace emergency spillway A demonstration that riprap is not needed was <br />Impoundment No. 1 riprap, or provide submitted and approved by the Division on <br />so as to provide demonstration that riprap is 12/12/94 (Technical Revision 6, November 30, <br />proper riprap at the not needed. 1994). <br />emergency spillway. <br />Comments - Remove the two barrels and The materials were removed from the site on 29 <br />Compliance, Non- tire/wheel by cabin. Also November 1994 and disposed of in a proper <br />Coal Waste. remove culvetts located manner. <br /> outside of fence by cabin. <br />LE 1091/3/111-13-95(R -0Sam) <br />