My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36818
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:02 PM
Creation date
11/21/2007 3:15:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006053
IBM Index Class Name
Enforcement
Doc Date
7/11/2006
Doc Name
Unpermitted Construction Material Extraction or Exploration Op
From
DRMScmr
To
Canyon Rim Stone Quarry LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health or safety hazard, describe -None. <br />STATUTE VIOLATED AND DESCRIPTION <br />X C.R.S. 34-32.5-109(1) mining without a permit. <br />C.R.S. 34-32.5-113(1) exploring without an approved NOI. <br />C.R.S. 34-32.5-109(1), or 113(1) <br />Canyon Rim Stone Ouany LLC (Operator) is conducting a minin¢ operation in the following location: <br />Section 3 ,Township 31 South, Range 54 West, 6`h P.M. <br />HISTORY OF VIOLATIONS <br />1. Operator: <br />(a) Any outstanding corrective actions or unpaid civil penalties? <br />None <br />(b) History of any and all past violations and timeliness of corrective actions. <br />None <br />2. Landowner: <br />(a) Any outstanding corrective actions or unpaid civil penalties? <br />None <br />(b) History of any and all past violations and timeliness of corrective actions. <br />None <br />STAFF RECOMMENDATION <br />Violation(s): <br />Staff recommends that the Board issue a violation of C.R.S. 34-32.5-109(1) for failure to first obtain from the <br />Board or Office a Reclamation Permit prior to engaging in a new operation. <br />Cease and Desist Order <br />Staff recommends that the Board issue a Cease and Desist Order until the operator receives approval for the <br />submitted 110c Construction Materials Reclamation Permit. <br />Corrective Action(s): <br />1. Require the operator and/or landowner to secure an approved Construction Material (110) or (112) <br />Extraction permit by September 30, 200fi. <br />2. Require the operator and/or landowner to post a reclamation bond: In the amount of $ 30 000 <br />by September 30.2006. <br />3. Other corrective actions: none <br />
The URL can be used to link to this page
Your browser does not support the video tag.