Laserfiche WebLink
-2- <br />Aoolication Review Procedures <br />The Division will act upon your application within thirty (30) days of receipt <br />The Division will grant your request for a permit transfer if it finds that'•he successor operator is capable of assuming all <br />responsibility for the conditions included under the original permit by virture of acceptable perfonrtance and financial <br />warranties. Your request is automatically approved if it has not been denied by the Division within thirty (30) days of <br />filing. <br />[f the Permit Transfer application is denied, you will be notified within ten (l0) days of the decision deadline. You may <br />appeal the Division decision to the Mined Land Reclamation Boazd by submitting a written Request for Administrative <br />Appeal to the Division within sixty (60) days of the date of the decision (please refer to C.R.S. 34-32-114 and 115, and <br />C.RS. 34-32.5-114 and l 15 and Rule 1.4.7). <br />Notice of Permit Transfer is acknowledged in the monthly activity report attached to Lhe monL'tly Boazd Agenda. <br />Once the Permit Transfer document is approved, the originally submitted Perfomtance and Financial Warranties will fie <br />returned to the previous operator, as the previous operator is no longer responsible for the reclamation of the transferred <br />operation. <br />NOTICE TO SUCCESSOR OPERATOR: <br />1) Once the Permit Tractsfec is approved, you will be responsible for maintaining the mining and reclamation <br />operations in axnpfiance with the Mined land Reclamation Ad and the Mineral Rules and Regulations for Hard <br />Rock, Metal and Designated Mining Operations or the Colorado Land Reclamation Ad for the Extraction of <br />Construction Materials and the Construction Material Rules and Regulations. <br />2) All of the application materials, as amended and supplemented, are an integral part of the pemtit. They have <br />been incorporated into the permit by reference. We suggest you keep a copy of the permit, the permit <br />application, and a copy of the regulations at the mining operation as a reference. If you are unable to secure a <br />copy of the permit application from the original operator, you may purchase a wpy from the Division. <br />3) Changes in the mining and t•eclamation operations that differ from those described in the permit may require <br />a revision to the permit We suggest consulting the Mineral Rules and Regulations or the Construction Material <br />Rules and Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.8 and <br />1.10 peRains to Amendments, Rule 1.9 to Technical Revisions, and Rule 1.1 1 to Conversions. <br />4) On your pertit anniversary date each year, you MUST submit an annual fee and report to the Division. Please <br />consult C.R.S. 34-32-127(2) for Hard Rock and Metal Mines or C.R.S. 34-32.5-125 for all construction <br />materials operations for the applicable annual fee requirements for your operation. <br />