My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-26_REVISION - M2000041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2003-12-26_REVISION - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:19:03 PM
Creation date
11/21/2007 3:10:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Revision
Doc Date
12/26/2003
Doc Name
Tsf of permit and S.O. application
From
CR Evans
To
DMG
Type & Sequence
SO2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ , U~ Gv 0.-nS <br />STATE OF COLOI~DO <br />DIVISION Of ,~rL~ERAIS AND GEOLOGY ,/ q CD O~ ~ ,/ ~ D ~ / <br />Oepanment of .Natural Resoarc_s ~ Z~ <br />] t J Sheri an 5:.. Room '_ t ; <br />Denver. Colorado Bn'_Ol <br />Phone: 0031 fl66Ji67 TR4NSFER OF b[INERAI. RECLAJ~(ATION PER,~IIT <br />FAt: 0071 flJ'_-9106 <br />~ ~ >G~ <br />~"~Lt;' ~" is. <br />OE-~ 2 ~ 20~ <br />d Geoleo`! <br />n;,nsloo of Mtnarals an <br />Aoolicability <br />AND <br />SUCCESSION OF OPERATORS / <br />APPLICATION PACKAGE <br />~~~~~~1 f~+i.~i <br /> <br />D I V I S I O N <br />MINERA' <br />F.- <br />GEOLOG <br />R E C L A n A r l c <br />nIN ING•$AFE <br />JAN 162(104 / Bill Ovens <br />Covernd <br />DIYISIOa of Minerals and Geolo G"~ E. w,lcher <br />99 Eaeeuuve O,re:ee« <br />Mirha<I 0. Long <br />Division Director <br />This docvmcnt appGa to mining opeations where the current permitted mine operator wishes to ttartsfer the Rxlamation <br />Permit and permitted reclamation responsibilities to a Sutcessor Operator (anew operator). Plrse fbUow the instttrctions <br />provided in this package for filing an application; Mineral Rules and Regulations and Consttuction Material Rules and <br />Regulations Number 1.12 (Permit Transfer application requirements) should also be reviewed prior to completing this <br />form. <br />Fline Requirements <br />To apply for a transfer please submit the following to the Division of Iviinerals and Geology (tlJe 'D'tvision~: <br />L) A "Transfer of Permit and Succession of Operator" application form signed and notarized by an authorized <br />representative of BOTH the current pcrmittee and successor operator; <br />2) The Application Fee of S 100.00 far Hard Rack operaions and $125.00 for Construction Materials operations; <br />3) A Performance Warranty Form bearing an original notarized signature of an authorized representative of the <br />successor operator; and, <br />4) Financial Warranty: <br />A) You have the Dorian to WAIVE YOUR RIGHT to a thirty (30) day processing time to allow the <br />Division time to recalculate the required fmanciai warranty; or, <br />B) You may choose NOT TO W AIVE YOLK. RIGHT to a thirty (30) day processing time. In such case, <br />the Division will recalculate the required fmancial warranty within sixty (60) days from the decision <br />date (the date the permit is tzansferred to the Successor Operator). The required RECLAMATION <br />BOND COULD BE SUBSTANTIALLt' INCREASED at that time. iE the fmancial warranty is <br />increased, you will thrn be required to post the additional financial warrann•. <br />This application package contains the "Transfer of Permit and Succession of Operator" application form, and a <br />Performance Warranty form for your use. Rule 43 of the ivtineral Rules and Regulations and Rule 43 of the Construction <br />Material Rules and Regulations describes the various acceptable Financial Warranty types. Please contact dJe Division <br />to obtain the appropriate Financial Warranty Corm. <br />Upon submittal of this. application, the application fee, and the replacement performance and financial warranties the <br />Division will transfer the permit to the Successor Operator. After the transfer is complete the Division will then review <br />the rxiamation cosu of the permitted operation. The Successor Operator will be notified, if additional rulamation bond <br />is required, within 60 days of approval if you do not wave your right to a decision within 30 days. The Division will notiCy- <br />both operators upon completion of the permit uansfer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.