Laserfiche WebLink
FLAG RESOURCES, INC. PAGE 2 <br />5'IlT PIT - TECHNICAL REVISION <br />SEPTEMBER 79,2006 <br />The second pole barn is where landscaping rock is sorted and <br />palletized. This building will be converted to an equipment shed <br />when mining ends. <br />The office building is a modular home that is adapted as an <br />office. It will eventually be converted to a home once the <br />gravel is gone. <br />Attached is a check for the $188.00 Technical Revision fee <br />and if you have any questions please call me at the above number <br />or Steve O'Brian of Environment, Inc., at (303) 423-7297. <br />Sincerely, <br />Flag Resources, Inc. <br />~~ <br />Fred Frei, <br />President <br />cc Environment, Inc. <br />File <br />enclosures <br />