My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-04-03_REVISION - M1983141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2007-04-03_REVISION - M1983141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:49 PM
Creation date
11/21/2007 3:04:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
4/3/2007
Doc Name
Adequacy Review Comments
From
Mount Royale Ventures, LLC
To
DRMS
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Thomas A. Schreiner <br />April 29, 2007 <br />Page 3 <br />Table 1 -Colorado Agricultural Groundwater Standards <br />Parameter Standard <br />Aluminum (AI) 5 mg/L <br />Arsenic (As) 0.1 mglL <br />Beryllium (Be) 0.1 mg/L <br />Boron (B) 0.75 mg/L <br />Cadmium (Cd) 0.01 mg/L <br />Chromium (Cr) 0.1 mg/L <br />Cobalt (Co) 0.05 mg/L <br />Copper (Cu) 0.2 mg/L <br />Fluoride (F) 2 mg/L <br />Iron (Fe) 5 mg/L <br />Lead (Pb) 0.1 mg/L <br />Lithium (Li) 2.5 mg/L <br />Manganese (Mn) 0.2 mglL <br />Mercury (Hg) 0.01 mg/L <br />Nickel (Ni) 0.2 mg/L <br />Nitrite (N02-N) 10 mg/L <br />Nitrite&Nitrate (N02+N03-N) 100 mg/L <br />Selenium (Se) 0.02 mg/L <br />Vanadium (V) 0.1 mg/L <br />Zinc (Zn) 2 mg/L <br />pH 6.5-8.5 <br />Source: CWQCC, 2005. Regulation No. 41, Table 3. <br />Reaorting of an Exceedance <br />When an exceedance of a parameter is identified by sampling, MRV will report <br />the exceedance to DRMS within 30 days of the receipt of the results of the water <br />quality analysis that identifies the exceedance. The report shall contain the <br />results obtained in the water quality monitoring round, an evaluation of the <br />results, and a proposal for mitigation of the exceedance. <br />Mitigation of an Exceedance <br />The method of mitigation of an exceedance will be determined at the time of the <br />identification of the exceedance. The mitigation will be specific to the location of <br />the monitoring point at which the exceedence was identified, the parameter for <br />which the exceedance was identified, and the potential for environmental impact <br />as a result of the exceedence. <br />CONSTRUCTION OF WELLS <br />Comment <br />3. In response to Rule 3.1.7(7)(b)(vii), please clarify the time schedule for <br />implementation of re-construction of up-gradient Iaell (MW-1) and construction of <br />down-gradient well (MW-5). <br />
The URL can be used to link to this page
Your browser does not support the video tag.