. 06iy 9i i'??9 14:07 FROM TO 1038328306 <br />?age 3 <br />.June 7, 1990 <br />Snyder Correction ~tctiona <br />Bruce Humphries <br />3. Culvert HR-6 cannot be in `.slied until the engineer <br />from the Cedar Heights lenders hoe x•eviexed the proposed <br />ootione. As of the date of this letter ve have not received <br />any comments from that party. We have inquired as to hew <br />much longer St will take, but nave not received an answer to <br />our inquiry. in the meantime, Caatly xiil try to keep any <br />problems that occur as a result of that culvert not being <br />installed under control, such as removing any sediment <br />deposited on the Cedar Heights road as a direct reauit c <br />t'r,is r_ulvert not being installed. We would like to point <br />out that the existing condition has been the case for me.ny <br />years and that problems resulting from not having a culvert <br />installed at this location nave been minimal. Nobody brit <br />Mr. Nagai has complained about sediment on the road. <br />Hopefully, the Cedar r~eights engineer w21i submit their <br />reviax soon so this matter cah fia:.ally be brought to s <br />satisfactory solution. <br />4. Tree planting had to be canceisd for this 6pri:ig, <br />although xe obtained the trace from the State sorest <br />Service. Currently, the tress are in storage and being <br />maintained in accordance with instructions provided by ':he <br />State rr^oreet Service nursery in rt. Collins. '+Jv intend to <br />plant all of the trues this September. Aittiough xe hav.j <br />been told fall planting msy result in a slightly higho:' <br />mortality, the fact that most of the trees will be planed <br />on s north Pacing elope rill help reduce winter kill. <br />The reason the trees vase not planted this ep;ring <br />ors eeverxl. <br />1. The grading xork on area {~1 and /~4 took l~~nger <br />than expected and xas more difficult (especially on F~4) than <br />expected. <br />2. Installation of culverts, en action aaaeee,iry <br />to protect the regraded siopen from exr.ysaive erosion, took <br />longer than expected and rsquirefl some redaeign o£ the <br />concrete xork at the eatrancae and exits to the culverts. <br />3. Our original construction plea vac based, as <br />you recall, on a November 1, 1989 start date. Because of a <br />delay in receiving final approval from the Board until mtd- <br />Decembvr xe started the work 6 weeks behind schedule and at <br />toe start of the elates season which greatly.limited the <br />amount of vork that could be done that could have been 3one <br />1£ ve could have begun in November. <br />P.04 <br />