My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36337
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:43 PM
Creation date
11/21/2007 3:01:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
6/8/1990
Doc Name
FAX COVDR-SNYDER CORRECTIVE ACTION LETTER
From
CASTLE CONCRETE CO
To
MLRD
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~Btii00i19?0 14:0¢ FROM TB iS03032B106 <br />P.03 <br />Page 2 <br />June 7, X490 <br />Snyder Correction Actions <br />3ruce Humphries <br />'Rork yet to be done: <br />1, Disturbance Areas #2 sad #3 must be graded <br />according to the plan. See description of problems. <br />2. Silt fences need to be installed on Disturbance <br />Arse #1, <br />j. AR-6 needs to be installed. <br />4. Trses must be planted in Williams Canyon sad on ':he <br />roadside disturbance arses. <br />5• The sediment basin must be constructed. <br />Problems encountered during the implementation: <br />1, Disturbance Arena #2 and #3 era being ezaained from <br />the standpoint of solving the logistical problems o£ <br />removing the material. The method used on area #4 cannot be <br />used hers as the elopes are too steep to construct sny $ind <br />of bench from xhich equipment could work. The method used <br />on Area ~1 cannot be used because removal is needed rattier <br />than dust reshaping. lox that the thunderstorm season is <br />noon us it is our opinion that it would be inadvisable to do <br />sny work in regrading roadside disturbances #2 and #3 as <br />there would be little opportunity to control erosion by the <br />time the work ie completed. Therefore, regrading of areas <br />#2 and #3 will be delay9d until autumn and revegetation <br />implemented at that time. <br />2. Disturbance Area #4 needs to have the grades <br />ed~ustad. In order to remove the material a bonch needed to <br />be construoted out of the fill material. This resulted in <br />the produotion a£ a longitudinal shape Lhat is eomnwhat <br />different from that .SnLendod. To eorreot the problem a <br />large dozer meet be acquired that hoe a cable and winch <br />attached. This will allow the use of a email dozer to <br />finish grading the slope while the large dozer, narked cn <br />the roadway, holds the small dozer on the elope and helps it <br />to move up and dove the steep elopes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.