Laserfiche WebLink
Ms. Sandra Brown <br />October 30, 2000 <br />Page 2 <br />To the best of my knowledge and belief, field adjustments made <br />during construction to the structure are in conformance with the <br />Rules and Regulations in the intent of the approved design plans <br />and specification (see Exhibit 13-8A, Sheet 1 of 2). <br />OCT 3 0 2000 <br />Date <br />ColoradV~.. E . 28 <br />"~UNAI t`' <br />Seneca will a preparing a Technical Revision package for <br />submittal to the Division in the next few weeks, which will <br />contain the complete as-built report and drawing, as well as <br />final geotechnical and compaction testing results, as we have <br />done in the past. Based on the information provided, Seneca <br />believes that the necessary steps for abatement of this NOV have <br />been met. Please contact me if you or any other members of the <br />Division have any questions regarding this information. <br />Sincerely, <br />"__ _ „~ C~~¢~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />