Laserfiche WebLink
the Durham Pit and to bring the site into compliance with current Construction Materials <br />Act Rules and Regulations. <br />The Applicant's amendment application ("Amendment Application") was considered filed <br />by the Division on May 24, 2004. <br />Michael Bliss of Bliss Produce Company filed a timely objection to the Amendment <br />Application. <br />This Boazd has jurisdiction over the parties and the subject matter of this proceeding <br />pursuant to Section 34-32.5-114, C.R.S. (2004). <br />6. The Board appointed a preheating conference officer who conducted a preheating <br />conference on January 30, 2004 in Denver, Colorado. The preheating conference officer <br />prepazed a proposed preheating order. Parties who appeared at the preheating conference <br />included the Applicant and the Objector. The City of Greeley sent representatives to the <br />preheating conference but failed to submit written comments or appear at the formal public <br />hearing. <br />The Board approved the proposed preheating order with two modifications, deleting the <br />City of Greeley and Shazon and Kevin Carbaugh as parties to the proceeding. <br />8. The issues set forth in the preheating order are: <br />(A) Will the Applicant minimize disturbances to the prevailing hydrologic balance of <br />the affected land and of the surrounding area and to the quantity and quality of <br />water in surface and groundwater systems during and after the Honing operation, <br />specif tally with respect to (i) potential dewatering and lowering of the alluvial <br />aquifer; and (ii) potential flooding from the berm/dike constructed in the <br />floodway of the Cache la Poudre River? (Construction Materials Rule 3.1.6(1)) <br />