My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35957
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:25 PM
Creation date
11/21/2007 2:51:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/7/1993
Doc Name
Request for Vacation & Information for NOV
From
ARCO LEGAL
To
DMG
Violation No.
CV1993114
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . <br />.~ <br />~. <br />1 f L Comments - Campl fence <br />Below are comments on the inspection. The comments in:ltiAe discussion of <br />.. . observations i~ ae„during tiie Inspection. Comments also describe any <br />enforcement ncttdhs taken during the inspection and the f~cts.or evtden.ce <br />suooorttno the enfortement action. <br />This was .a complete i[tspoetLon of the Weat Ellc Nine completed by <br />Christina Johnston of the Division. Henry Austin of the Jifice of <br />Sttrfare Mining wan present nlong with Hanry Barbs representing <br />Mountain Coal Cgnpeny. The inspection wan conducted over three <br />days; the first day conalsted of checking records and,~kle, remainder <br />of the time was spent doing ,t he site inspection. The fii•et day wa: <br />C10 Utly and rnining periodically and the other two days were clear <br />anc! worn, <br />AVAILABILITY ON RECORDS • <br />West Ellc's revised SPCC, plan requires viausl inapectiona to be done <br />annually in August. Aooording to the operator, thls.~.pRpection has <br />been completed but nt the tine of the Division's inspection, the <br />Earn contaihud in ttie SPCC plan had not been filled out. The <br />results of thLa inspection should .be entered in this torn prior to <br />the Dlvialon'a next canplete inspection. Pond inapectiona should <br />continue to be completed on a quarterly basis, The DMO permit is <br />on file 'and expire^ on July 91, 1988. The inspectors recommended <br />that annual certifications be completed on all ponds, not ~uat the <br />oversized ponds. It was determined that proper notice had nut barn <br />`Sven to surface laudownera over areas to be mined; therefore, NOV <br />C-92-112 wan iaauad. <br />An additional permit boundary•marker should 6e placed on the <br />• -• eastern end of the loadottt. The permit bot[ndary marker on the <br />fence which faces the river should bo replaced with a Mountain Coal <br />Company sign. <br />0 DS <br />There is currently a light-uao road around the base of the reluee <br />pile that was constructed withour. Division approval; therefore, NOV <br />C-93-l1a xas lsaued. Irt addition, MCC has a number oP light-use <br />roads that are used.te access upper areas for monitoring purposes <br />that have not 6cen Sncluded !u the permit document's description of <br />fight-.tan roads. MCC should aurvec the mina site for all light-ume <br />roads for Sttclttsion in the pec•mlt, Rttla 1.0•i.lll(c) defines a <br />light-use road. There are aevernl water bare along the road used <br />to rr.sclt the upper mendoti,•, whicl[ appear to be Punctionnl. Thcrc is <br />howe~•er, ^ome e[•osion occtt[•ring on the lowrr reaches o1' this road. <br />MCC should consider regt•adinq this road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.