My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-02-24_REVISION - M1977153 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977153
>
2004-02-24_REVISION - M1977153 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:31 PM
Creation date
11/21/2007 2:46:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977153
IBM Index Class Name
Revision
Doc Date
2/24/2004
Doc Name
Construct Slurry Wall
From
Denver Water
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bids shall be deposited at the designated location prior to the time <br />and date for receipt of Bids indicated in the Invitation to Bid, or <br />the modified time and date indicated by Addendum. Bids received <br />after the time and date for receipt of Bids will be returned <br />unopened. <br />Bidder shall assume full responsibility for timely delivery at the <br />location designated for receipt of Bids. <br />Oral, telephone, or telegraph Bids are invalid and will not receive <br />consideration. <br />No Bidder may submit more than one Bid. Multiple Bids under <br />different names will not be accepted. <br />13.04. Bids to Remain Open <br />All Bids shall remain open for 45 days after the day of the Bid <br />opening. OWNER shall release Bids and return bid securities as <br />specified in this Section under "Return of Bid Security." <br />14. AWARD OF CONTRACT: <br />OWNER shall award a <br />lowest responsive, <br />upon the total bid. <br />the Work. OWNER <br />informalities and t <br />Bids. <br />Contract to the Bidder who, in OWNER's judgment, is the <br />responsible Bidder after an evaluation of bids based <br />OWNER will not award a Contract for only a portion of <br />reserves the right to reject all Bids, to waive <br />o reject nonconforming, non-responsive, or conditional <br />In evaluating Bids, OWNER shall consider the qualifications of the Bidders, <br />whether or not the Bids comply with the prescribed requirements, and <br />whether or not all lump sum amounts as requested in the Bid Form has been c <br />completed. OWNER may consider the qualifications and experience of <br />subcontractors and other persons and organizations (especially those who <br />are to furnish the principal items of material or equipment), and may <br />reject the Bid of any Bidder who does not pass any such evaluation to <br />OWNER's satisfaction. <br />If the Contract is awarded, OWNER shall give the apparent successful Bidder <br />a Notice of Award within 45 days after the date of the Bid opening. <br />15. COUNTERPARTS OF TH8 AORE8M8NT: <br />ENGINEER shall furnish to CONTRACTOR three copies of the Agreement and <br />other Contract Documents bound therewith. CONTRACTOR shall execute the <br />Agreement, insert executed copies of the required bonds and power of <br />attorney and deliver all copies to ENGINEER within 10 days. The date of <br />Contract on the Agreement and Bond Forms shall be left blank for filling in <br />by OWNER. The certification date on the Power of Attorney also shall be <br />left blank for filling in by OWNER. Three copies of Certificate of <br />Insurance are also required at this time. <br />(BOARD OF WATER COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II) <br />(AND BRZNKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ) IB-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.