My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-02-24_REVISION - M1977153 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977153
>
2004-02-24_REVISION - M1977153 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:31 PM
Creation date
11/21/2007 2:46:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977153
IBM Index Class Name
Revision
Doc Date
2/24/2004
Doc Name
Construct Slurry Wall
From
Denver Water
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TC-2 <br />VOTJTMF. T <br />GENERAL CONDITIONS <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Article <br />Page <br />GC-1 to GC-62 <br />1--Definitions <br />2--Preliminary Matters <br />3--Contract Documents: Intent, Amending, Reuse <br />4--Availability of Lands; Subsurface and Physical <br />Conditions; Reference Points <br />S--Bonds and Insurance <br />6--Contractor's Responsibilities <br />7--Other Work <br />B--Owner's Responsibilities <br />9--Engineer's Status During Construction <br />10--Changes in The Work <br />it--Change of Contract Price <br />12--Change of Contract Times <br />GC-1 <br />GC-5 <br />GC-7 <br />GC-10 <br />GC-15 <br />GC-21 <br />GC-34 <br />GC-35 <br />GC-36 <br />GC-39 <br />GC-40 <br />GC-45 <br /> <br />13--Tests and Inspections; Correction, Removal <br />or Acceptance of Defective Work GC-46 <br />14--Payments to Contractor and Completion GC-50 <br />15--Suspension of Work and Termination GC-57 <br />16--Dispute Resolution GC-59 <br />17--Miscellaneous GC-59 <br />SUPPLEMENTARY CONDITIONS SC-1 <br />SPECIFICATIONS: DETAILED SECTIONS <br />DIVISION 1 - GENERAL REQUIREMENTS <br />SECTION 01110 SUMMARY OF WORK 1-1 <br />SECTION 01025 MEASUREMENT AND PAYMENT 1-6 <br />SECTION 01040 COORDINATION 1-3 <br />SECTION 01300 SUBMITTALS 1-3 <br />SECTION 01500 TEMPORARY FIELD OFFICES, UTILITY SERVICES <br /> AND CONSTRUCTION FACILITIES 1-3 <br />SECTION 01700 CONTRACT CLOSEOUT 1-2 <br />DIVISION 2 - SITE WORK <br />SECTION 02010 SUBSURFACE INVESTIGATIONS 1-1 <br />SECTION 02212 EROSION AND SEDIMENT CONTROL 1-2 <br />SECTION 02230 CLEARING 1-2 <br />SECTION 02316 EXCAVATION 1-3 <br />SECTION 02317 FILL AND BACKFILL 1-6 <br />SECTION 02340 SOIL-BENTONITE CUTOFF WALL 1-14 <br />SECTION 02605 PRECAST CONCRETE MANHOLES AND STRUCTURES 1-4 <br />SECTION 02901 SITE RECLAMATION 1-2 <br />SECTION 02935 SEEDING 1-3 <br />DIVISION 15 - MECHANICAL <br />SECTION 15060 CORRUGATED POLYETHYLENE DRAINAGE PIPING 1-3 <br />DRAWINGS DR-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.