Laserfiche WebLink
<br />Mr. Paul Thomsen - 2 - May 3, 1994 <br />Stipulation No. 04 <br />BEFORE DISTURBING ANY PART Of PHASE 2 OR 3, OPERATOR WILL SUBMIT TO THE <br />DIVISION THE MINIMUM AMOUNT OF GROWTH MEDIUM (SPECIFIED AMOUNTS OF <br />SANDY OVERBURDEN FINES AND AVAILABLE TOPSOIL) REQUIRED FOR RECLAMATION <br />OF THAT PHASE. THIS MATERIAL WILL BE STOCKPILED IN DESIGNATED AREAS <br />ON-SITE UNTIL IT IS USED FOR RECLAMATION ACTIVITIES. ALTERNATIVELY, <br />THE OPERATOR CAN POST THE NECESSARY BOND FOR HAULING SUFFICIENT <br />MATERIAL IN FROM OFf-SITE. <br />Stipulation No. OS <br />THE OPERATOR WILL COFtMIT 70 CONDITIONS 1 THROUGH 4, AS OUTLINE(1 IN THE <br />3/28/94 MEMO (ATTACHED) 4?EGARDING THE LOAD-LNJT BENCHES BY MR. I~LLEN <br />SORENSON, BEFORE ANY NEW AREAS ARE DISTURBED. OPERATOR WILL PF;OVIDE <br />AS-BUILT DRAWINGS AND NARRATIVE, PERTINENT TO THE CONDITIONS MENTIONED <br />ABOVE, IN THE ANNUAL REPORTS FOR THE SLAB CANYON QUARRY DURING EACH <br />YEAR THAI LOAD-OUT BENCHES ARE CONSTRUCTED. <br />If you have any questions, please contact me. <br />Sin~ceirely, <br />Ga`r'y S. Curtiss <br />Environmental Protection Specialist <br />GSC/dmm <br />Enclosures <br />Cc: Garl Mount, DMG <br />Mr. Elden Ackerman <br />Fort Collins Soil Conservation District <br />Larimer County Board of County Commissioners <br />8919G <br />