My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-02-11_REVISION - M1981302
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1980-02-11_REVISION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:50:58 PM
Creation date
11/21/2007 2:44:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
2/11/1980
Doc Name
MEMO
From
BOULDER CNTY PLANNING STAFF
To
BOULDER CNTY PLANNING COMMISSION
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> planning divinon <br /> p.o. box 471.13th ord;prate meet bouidv. cotorodo 80306.441-1930 <br /> MEMORANDUM 1 <br /> rV <br /> DATE: February 11, 1980 <br /> TO: Boulder County Planning Commission <br /> FROM: Boulder County Planning Staff <br /> Staff Recommendation <br /> Docket WAR-79-4 - South Boulder Creek <br /> Aequest: A;-proviToOF specia permit for construction of an <br /> embankment and channel in the floodplain in the Rural <br /> Residential (RR) 2oning District <br /> Location: Approximately h mile east of Colorado 93, k mile south <br /> of the Denver Turnpike and west of South Boulder Creek <br /> Applicant: Flatiron Sand b Gravel Company <br /> DISCt1SSI0N: <br /> This is a request for the construction of an embankment and channel <br /> along the western edge of South Boulder Creek pursuant to the Section XXIV <br /> Special Permits of the Zoning Resolution. The purpose of this request <br /> is: <br /> 1. To provide 10D-year flood protection for possible extraction <br /> of sand and gravel reserves located west of the proposed project <br /> 2. To control the flow of the 100-,veer flood and to minimize <br /> any impact to the flood discharge <br /> The request will effect the floodplain of South Boulder Creek; however <br /> the applicant is not requesting the modification of the floodplain nor <br /> the delineation of the flood regulatory area into storage and floodway <br /> areas. The Public Works Department has noted the the present floodplain <br /> designation will .not be amended until such time as the Corps of Engineers <br /> flood study for south Boulder Creek has been completed. <br /> In addition Public Works has noted that proposed dike does not appear <br /> to be a necessary fl000plain modification to allow the contemplated use. <br /> The planning staff agrees that the dike is not a regiment for a gravel <br /> mining operation. If it is contemplated that the lend wilt be developed <br /> for other uses, it Should be understood that the County is not approving <br /> the dike as a means of removing the property from the South Boulder <br /> Creak floodplain. <br /> The City of Boulder bat noted they have no conflict with the proposal <br /> provided that the additional waters to be carried on the City Open Space <br /> property will not cause substantiel damage. Based on their letter from <br /> wml <br /> EXHIBIT N0.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.